Kargalinsky waterworks in Dagestan brought back into operation after RUB 1.3 billion reconstruction project
The capacity of the channel is 14 cubic meters per second, allowing for the passage of fish around the dam on the Terek River.
Found: 2 results
The capacity of the channel is 14 cubic meters per second, allowing for the passage of fish around the dam on the Terek River.
of the river, and its preliminary cost exceeds RUB 900 million.