Five big eco-projects launched in Dagestan in 2022
Besides, thanks to a cooperation agreement between the Republic of Dagestan and PJSC RusHydro, a small hydropower plants will be built in the
Found: 44 results
Besides, thanks to a cooperation agreement between the Republic of Dagestan and PJSC RusHydro, a small hydropower plants will be built in the
The document was signed on December 22 in Moscow. The new hydropower facility with a capacity of 49.8 MW is to be built on the Avar Koisu River.
The new corrugated pipe plant, Truboplast LLC, will be built in the city of Dagestanskiye Ogni. The project cost is 662 million rubles.
A new solar power plant with a capacity of 100 megawatts will appear in Derbentsky municipal district of Dagestan.
a meat processing plant in Kizilyurtovski municipal district.
A plant for the production of corrugated pipes worth more than 600 million rubles will be constructed in the city of Dagestanskiye Ogni (the project
“We assume that it will be a state-owned enterprise. An investor is involved in implementation of the project” - the top official said.
;the capacities are going to be located at Dagdiesel defense plant in Kaspiysk).
The local authorities conduct an active work to revive the fishing industry in the republic and intend to build a fish processing plant.
A special workshop had already been built on the territory of the plant.
But the main engine of growth was the creation of the branch – the Aviation Mechanical Plant (AMP), built in Kaspiysk.
The Chairman of the Government of Russia Dmitry Medvedev signed a decree on the establishment of Accelerated Development Territory in Dagestan city of
The plant production will be supplied to the markets of the Russian regions, especially in the North Caucasus Federal District.
Caspian Almar" JSC took place in Novolaksky district of Dagestan.
The hotels, cottage village, restaurants, water parks, water attractions, sports facilities, as well as a mooring for boats and yachts will be built o...